Cleanup, digestion and renewal of covering blocks containing asbestos cement. The intervention has been performed on two shed bodies, one at groundwater tapping and the other at vault, for a total surface of about 2000 m2. The new covering is composed of pre-painted zinc coated steel panels of 6 millimetres on the bottom and 0.45 millimetres on the top.
Marble Escavation Processing Srl (LT)